Office

Kaiser TRM Innovation Center

The new Kaiser Permanente Tustin Ranch Medical Offices is located just off the 5 freeway between Jamboree and Tustin Ranch. This new medical office houses Kaiser Permanente’s largest Pediatrics module in Orange County. Oltmans Construction Co. was hired to remodel the 4,500 s.f. of open space for the Kaiser Permanente Southern California Innovation and Learning Center.

The scope of work included a new interior entry storefront with herculite doors, glass panel modern fold doors, wood framed staircase, a unistrut ceiling support system, hang lights, speakers with an open ceiling concept, and an exterior courtyard inside the space. The innovation studio will have its own entrance located on the south end of the building separate from the main medical office entrance. Inside there will be a new large modern Collaboration Room and several small Collaboration Rooms with writeable surfaces throughout, glass magnetic boards, television monitors and two large BAF fans above the unistrut.

4,500 s.f.

Munchkin Offices

The scope of the project is to convert the existing steel warehouse buildings and
site into a new corporate office facility. The tenant improvements portion includes
the build-out of a mainly open office floor plan with custom built-in cubicles,
cabinets and desks. The office structure features corrugated metal ceiling, bamboo
wood flooring throughout, exposed spiral ductwork and architectural high bay
lighting.

Building: 95,000 s.f.
Office: 45,000 s.f.

Corporate Express

Single two-story concrete tilt-up cross-dock warehouse/distribution and corporate office.

Distribution Warehouse: Hybrid panelized roof structure, ESFR fire sprinkler system with 60,239 s.f metal deck with concrete fill mezzanine, cross dock with full concrete truck yards, Alucobond clad concrete panels and entry, sewer lift station, water booster pump system, and inline storm drain filtration unit. Tenant Improvement: 70,000 s.f. tenant improvement featuring interior storefront separation, glass hand rail, Alucobond panels at interior soffit, one elevator, Rapistan conveyor system and a 2000 kw back-up generator.

70,000 s.f.